Help with your seawall project·Naples
Isles of Capri · Your waterfront project

Seawall planning in Isles of Capri & Goodland

These are separate waterfront settings. Use the actual parcel and waterbody to route the work, and avoid borrowing a nearby city’s rules or a neighbor’s permit.

Describe your project on this page ↓
Isles of Capri waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Isles of CapriIsles of Capri waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Isles of Capri
Official land and water reference data. Marker: a documented neighborhood or public-land anchor, not a service address or neighborhood boundary.

Get to know your waterfront

Isles of Capri and Goodland belong in a broader south Collier planning conversation, but they should not be treated as one shoreline. The County has documented navigation concerns near Isles of Capri and reviewed individual Goodland dock proposals on Blue Hill Creek. Begin with the parcel’s jurisdiction, ownership and existing shoreline treatment; then identify which County, state and federal questions apply.

April 9, 2026 Collier hearing transcript

Use the right evidence for each community

Isles of Capri: verify access with current information

The County’s April 2024 Coastal Advisory Committee discussed shifting deep water and navigation markers at Big Marco Pass near Isles of Capri. That is historical evidence of a navigation issue, not a present channel guide. Ask a contractor to state the survey date and equipment assumptions behind its access plan. Historic channel discussion

The County lists Isles of Capri Paddlecraft Park separately from its motorized launch facilities. A named park or ramp is an orientation point, not permission to mobilize construction equipment. Public access directory

Goodland: identify the shoreline and overlay

An April 2026 hearing describes a Palm Point Drive application within the Goodland Zoning Overlay, on Blue Hill Creek in Rookery Bay Aquatic Preserve. The site had a riprap shoreline and a proposed dock. These are useful local distinctions, but that application’s measurements and requested permissions belong to that property. Goodland hearing record Blue Hill Creek setting Property-specific shoreline

  • Photograph the existing treatment: vertical wall, riprap or vegetated edge.
  • Ask the designer which option fits the observed problem and habitat.
  • Keep dock changes, dredging and vegetation work identifiable.
  • Resolve commercial access authorization before scheduling.

What could the work cost?

Compare access, habitat review, shoreline treatment and dock work as separate items. A price for repairing an existing wall is not directly comparable with rebuilding riprap or changing a dock layout.

Published contractor context, not a Naples average or a quote.

Compare quotes and plan a budget →

Find the relevant permits and records

Isles of Capri researched starting points
Starting pointWhat to resolvePrepare and look up
Collier County Marine PRMAR
Route seawall, dock, boatlift or marine demolition work for the actual parcel.
Identify the folio and full scope; permit intake is (239) 252-2400.
Collier County property and planning records
Confirm jurisdiction, overlay and the approvals tied to the parcel.
Request the folio-specific permit history, site plan and relevant planning records.

Prepare the questions for the responsible office.

Two communities, two project files

Use the steps that fit the property. Keep a separate folder for each site rather than transferring a permit assumption between communities.

  1. For Isles of Capri, document the equipment route

    Ask for current channel and clearance information appropriate to the proposed vessel. The historic Big Marco Pass discussion cannot establish access today.

    April 11, 2024 Coastal Advisory Committee minutes

  2. For Goodland, confirm overlay and habitat review

    Identify the parcel and waterbody, then ask County staff whether the Goodland overlay and aquatic-preserve questions apply to the proposed work.

    April 9, 2026 Collier hearing transcript

  3. Request parcel-specific marine records

    Collect the original wall or riprap permit, dock approvals and survey. Submit one complete description that identifies each marine work item.

    Collier public records routing · Collier Marine PRMAR application requirements

Start with what you know

Plan your Isles of Capri project

Share the property address, the changes you have noticed and any photos or previous plans you have.

Clear options for your waterfront. A practical next step.

Getting your form ready…

Isles of Capri project questions

Do Marco Island rules automatically apply nearby?

Do not route a project by the nearest familiar city name. Confirm the actual parcel jurisdiction first. The cited Goodland example was considered through Collier County, and its overlay and waterbody details were specific to the site. Ask for the same clarity for your address.

April 9, 2026 Collier hearing transcript

Does a public boat ramp guarantee contractor access?

No. The County’s directory identifies facilities, including Goodland Boat Ramp and the Isles of Capri paddlecraft facility. It does not authorize a private contractor’s equipment, staging or commercial use. Require a confirmed access arrangement in the proposal before treating mobilization as settled.

2025 Collier emergency management plan

Keep planning

Nearby waterfront guides

East Naples, Royal Harbor

View the local guide directory.

Show sourcesHide sources
  1. April 9, 2026 Collier hearing transcriptSource reviewed 2026-10-25
  2. April 11, 2024 Coastal Advisory Committee minutesSource reviewed 2026-10-25 · official indexed text
  3. 2025 Collier emergency management planSource reviewed 2026-10-25 · official indexed text
  4. Collier post-hurricane permit informationSource reviewed 2026-10-25 · official indexed text
  5. Collier Marine PRMAR application requirementsSource reviewed 2026-10-25
  6. Collier public records routingSource reviewed 2026-10-25 · official indexed text